Every requirement read, before you price.
The tender read, requirements and risks on one page with where it says so, and subcontractor quotes side by side. Your estimator chooses and sets the price.
How it goes today.
75,000
extra people the construction sector needs by 2029. In the office too.
Source: EIB, 2025
- 01The tender runs to hundreds of pages.Instructions, requirements, specification, drawings and clarification notes.
- 02Your estimator reads it in the evening.Next to the running projects. A requirement on page 87 slips through easily.
- 03Subcontractor quotes arrive one by one.Each in a different format, with different exclusions. Comparing takes days.
How it works, step by step.
One tender, Brede School Oost, from the invitation to your estimator’s choice. Click through the steps.
- 1 · Mon 09:12The tender comes in.Via TenderNed or the client’s email. Every document lands in the project folder straight away.Gmail09:12
Invitation to tender: New build Brede School Oost
Gemeente Oostervaart, Procurement → tenders@haverkampbouw.nl
Dear Sir or Madam,
We invite you to tender for the new build of Brede School Oost. You will find the documents attached.
Questions for the clarification note can be asked until 13 November. The tender closes on 8 December at 12:00.
Instructions.pdfRequirements.pdfSpecification.pdfDrawings (34).zip - 2 · Mon 11:40Requirements and risks on one page.Every requirement with where it says so. What differs from how you normally build is flagged.Tender Brede School Oost142 requirements read · 7 risks flaggedReady for your estimator
Knock-out requirements
- Two school-building references above 2,000 m², last five years (Instructions § 3.2)
- Energy performance stricter than the legal minimum (Requirements p. 14)
Risks
- Penalty per working day of delay, no cap (Instructions § 7.4)
- Groundwork: no soil survey attached (Specification § 2.1)
- Handover before the summer holiday is a hard requirement (Requirements p. 6)
Questions for the clarification note
- Is a soil report available?
- Does a community school count as a school building for the reference requirement?
- 3 · Mon 14:05The quote requests go out.To your regular subcontractors per trade, with only the documents they need. Your estimator approves the list.Gmail14:05
Quote request mechanical and electrical, Brede School Oost
Haverkamp Bouw, Estimating → offertes@installatietechniek-brands.nl
Dear Peter,
We are tendering for the new build of Brede School Oost and would like your quote for the mechanical and electrical work.
Note: the energy requirements are stricter than usual, see Requirements p. 14. Please send your price and exclusions by 24 November.
Specification ch. 5 and 6.pdfInstallation drawings (8).zipRequirements p. 12 to 16.pdf - 4 · Tue 25 NovThe quotes side by side.Price, scope and exclusions in one table. What is missing is noted.Your estimating
Subcontractors mechanical and electrical
Subcontractor Vs. budget Exclusions Installatietechniek Brands 2% lower None Complete Van Leeuwen Installaties 4% lower Solar panels, openings Scope missing Klimaatgroep Noord 6% higher None Complete Van Leeuwen looks lower, but leaves out the solar panels from Requirements p. 15.
- 5 · Tue 25 NovYour estimator chooses.The overview is ready in Slack or Teams. Which subcontractor, which price and whether you tender, your estimator decides.#estimatingEEverday
Brede School Oost: all quotes in, 2 questions open for the clarification note.
- Mechanical and electrical3 quotes, Brands complete
- GroundworkWaiting for soil report
- Delay penaltyRisk, discuss
Open in your estimatingPlan go/no-go
What’s in it.
Connections
- Your estimating software
- TenderNed
- Google Drive or SharePoint
- Gmail or Outlook
Tasks
- Reading the tender
- Requirements and risks
- Quote requests
- Comparing quotes
Channels
- Slack or Teams
Pages
- Requirements and risks per tender
- Quote comparison
You stay in control.
- Every requirement and every risk comes with where it says so.
- Your estimator approves which subcontractors get a request.
- Whether you tender, and at what price, you decide.
More work in Construction.
Work preparation and planning.
Requests by email, WhatsApp and phone turned into work orders, and tomorrow’s planning prepared. Your planner approves.
See how it worksHours and extra work.
Yesterday’s work orders checked, hours booked, and extra work flagged and put to your client before it’s forgotten.
See how it worksHandover and Wkb.
Drawings, inspections, photos and Wkb evidence collected during the work. The handover file grows with the build.
See how it worksStart with a conversation.
Half an hour on the work that comes round every week, and what AI can do there first.