Extra work put forward, before it’s forgotten.
Every morning yesterday’s work orders are checked and the hours booked. Extra work is flagged, with photo and explanation. Your project manager decides what goes to the client.
How it goes today.
5%
of construction turnover goes to failure costs.
Source: ABN AMRO, 2019 figure
- 01Work orders arrive on paper, as a photo, or not at all.Your work preparer checks them the next morning, between everything else.
- 02Extra work is agreed verbally.On site, between site manager and client. It gets written down later, or never.
- 03At the final invoice it becomes a discussion.Without a photo, a date and an approval, extra work is hard to bill.
How it works, step by step.
One renovation, Dorpsstraat 12, from a photo on site to the extra work proposal. Click through the steps.
- 1 · Mon 16:40A photo from site.The carpenter sends what he finds, the way he already does. The questions for the work order follow straight away.Haverkamp Bouw[Photo] Dorpsstraat 12. Beam behind the kitchen wall is rotten at the end. Has to go before the kitchen can go in.16:40Thanks Ruud. How many hours do you expect, and with how many people?16:41Tomorrow 6 hours with two of us. Plus a new beam and props16:44Noted as possible extra work. Could you send today’s work order too?16:44[Photo of work order] Here16:52
- 2 · Tue 07:30Yesterday’s work orders are checked.Hours booked to the right project and the right line. What differs or is missing is set apart.Your time tracking
Work orders Monday 26 October
Project Employee Hours Note Dorpsstraat 12 Ruud de Wit 8.0 Rotten beam, photo Extra work? Brede School Oost Kees Jansen 8.0 None Booked Molenweg 3 Ali Yilmaz 7.5 None Booked Molenweg 3 Tom Bakker No work order Follow up 23 work orders processed. 1 missing, 1 possible extra work.
- 3 · Tue 07:34The extra work is recorded.With photo, date and the place in the specification that shows it falls outside the contract.Your project administrationExtra work MW-07, Dorpsstraat 12Draft
- What
- Replace rotten beam behind kitchen wall
- Reported
- Mon 26 Oct, Ruud de Wit, 3 photos
- Estimate
- 12 hours, beam and props
- Specification
- Not in § 4.2 demolition, not in § 5 structural
Extra work, put forward- Outside the contract according to the specification.
- Needs fixing before the kitchen arrives on 3 November.
- 4 · Tue 08:00Your project manager decides.Yesterday’s extra work is in Slack or Teams. What goes to the client, your project manager decides.#work-preparationEEverday
Yesterday’s work orders: 23 processed.
- Hours booked22 work orders
- Extra work Dorpsstraat 12Put forward
- Work order Tom BakkerFollow up
Send to clientCall first - 5 · Tue 08:20The proposal is with the client.With photos, explanation and the quote, after your project manager approves. The answer comes back into the project.Gmail08:20
Extra work MW-07: beam behind the kitchen wall
Haverkamp Bouw, Project management → fam.vermeulen@gmail.com
Dear Mr and Mrs Vermeulen,
While removing the kitchen wall we found a rotten beam. It needs replacing before the new kitchen can arrive on 3 November.
Attached you’ll find photos, the explanation and the quote. Could you let us know by Thursday whether we may go ahead?
Extra work MW-07.pdfPhotos beam (3).zip
What’s in it.
Connections
- Your time tracking
- Your project administration
- WhatsApp Business
- Gmail or Outlook
Tasks
- Checking work orders
- Booking hours
- Recording extra work
- Putting extra work forward
Channels
Pages
- Extra work log per project
- Approval page for your client
You stay in control.
- What counts as extra work, and what it costs, your project manager decides.
- Nothing goes to a client without that approval.
- Every piece of extra work has a photo, a date and its place in the specification.
More work in Construction.
Tender and estimating.
The tender documents read, every requirement and risk on one page with where it says so, and subcontractor quotes side by side. Your estimator chooses.
See how it worksWork preparation and planning.
Requests by email, WhatsApp and phone turned into work orders, and tomorrow’s planning prepared. Your planner approves.
See how it worksHandover and Wkb.
Drawings, inspections, photos and Wkb evidence collected during the work. The handover file grows with the build.