Extra work put forward, before it’s forgotten.

Every morning yesterday’s work orders are checked and the hours booked. Extra work is flagged, with photo and explanation. Your project manager decides what goes to the client.

How it goes today.

5%

of construction turnover goes to failure costs.

Source: ABN AMRO, 2019 figure

  1. 01Work orders arrive on paper, as a photo, or not at all.Your work preparer checks them the next morning, between everything else.
  2. 02Extra work is agreed verbally.On site, between site manager and client. It gets written down later, or never.
  3. 03At the final invoice it becomes a discussion.Without a photo, a date and an approval, extra work is hard to bill.

How it works, step by step.

One renovation, Dorpsstraat 12, from a photo on site to the extra work proposal. Click through the steps.

  1. 1 · Mon 16:40A photo from site.The carpenter sends what he finds, the way he already does. The questions for the work order follow straight away.
    Haverkamp Bouw
    [Photo] Dorpsstraat 12. Beam behind the kitchen wall is rotten at the end. Has to go before the kitchen can go in.16:40
    Thanks Ruud. How many hours do you expect, and with how many people?16:41
    Tomorrow 6 hours with two of us. Plus a new beam and props16:44
    Noted as possible extra work. Could you send today’s work order too?16:44
    [Photo of work order] Here16:52
  2. 2 · Tue 07:30Yesterday’s work orders are checked.Hours booked to the right project and the right line. What differs or is missing is set apart.
    Your time tracking

    Work orders Monday 26 October

    ProjectEmployeeHoursNote
    Dorpsstraat 12Ruud de Wit8.0Rotten beam, photoExtra work?
    Brede School OostKees Jansen8.0NoneBooked
    Molenweg 3Ali Yilmaz7.5NoneBooked
    Molenweg 3Tom BakkerNo work orderFollow up

    23 work orders processed. 1 missing, 1 possible extra work.

  3. 3 · Tue 07:34The extra work is recorded.With photo, date and the place in the specification that shows it falls outside the contract.
    Your project administration
    Extra work MW-07, Dorpsstraat 12Draft
    What
    Replace rotten beam behind kitchen wall
    Reported
    Mon 26 Oct, Ruud de Wit, 3 photos
    Estimate
    12 hours, beam and props
    Specification
    Not in § 4.2 demolition, not in § 5 structural
    Extra work, put forward
    • Outside the contract according to the specification.
    • Needs fixing before the kitchen arrives on 3 November.
  4. 4 · Tue 08:00Your project manager decides.Yesterday’s extra work is in Slack or Teams. What goes to the client, your project manager decides.
    #work-preparation
    E
    Everday

    Yesterday’s work orders: 23 processed.

    • Hours booked22 work orders
    • Extra work Dorpsstraat 12Put forward
    • Work order Tom BakkerFollow up
    Send to clientCall first
  5. 5 · Tue 08:20The proposal is with the client.With photos, explanation and the quote, after your project manager approves. The answer comes back into the project.
    Gmail08:20

    Extra work MW-07: beam behind the kitchen wall

    Haverkamp Bouw, Project management → fam.vermeulen@gmail.com

    Dear Mr and Mrs Vermeulen,

    While removing the kitchen wall we found a rotten beam. It needs replacing before the new kitchen can arrive on 3 November.

    Attached you’ll find photos, the explanation and the quote. Could you let us know by Thursday whether we may go ahead?

    Extra work MW-07.pdfPhotos beam (3).zip

What’s in it.

Connections

  • Your time tracking
  • Your project administration
  • WhatsApp Business
  • Gmail or Outlook

Tasks

  • Checking work orders
  • Booking hours
  • Recording extra work
  • Putting extra work forward

Channels

  • WhatsApp
  • Email
  • PDF

Pages

  • Extra work log per project
  • Approval page for your client

You stay in control.

  • What counts as extra work, and what it costs, your project manager decides.
  • Nothing goes to a client without that approval.
  • Every piece of extra work has a photo, a date and its place in the specification.

More work in Construction.

PDFGoogle DriveGmailYour estimating

Tender and estimating.

The tender documents read, every requirement and risk on one page with where it says so, and subcontractor quotes side by side. Your estimator chooses.

See how it works
WhatsAppGmailYour planningGoogle Calendar

Work preparation and planning.

Requests by email, WhatsApp and phone turned into work orders, and tomorrow’s planning prepared. Your planner approves.

See how it works
Google DrivePDFWhatsAppGmail

Handover and Wkb.

Drawings, inspections, photos and Wkb evidence collected during the work. The handover file grows with the build.