The file is complete on the day you hand over.

Photos, inspections, drawings and Wkb evidence are collected while you build, per building part and with the source attached. Your project manager checks and hands over.

How it goes today.

2024

Since 1 January 2024 the Wkb applies. File quality varies and the completion notice causes trouble.

Source: Arcadis, Wkb monitor 2025

  1. 01Evidence sits in phones and inboxes.Photos with the site manager, inspections with the subcontractor, drawings in three versions.
  2. 02The file is put together at the end.In the last weeks, when everyone is already thinking about the next project.
  3. 03Then it turns out what’s missing.A photo of insulation that is already behind a wall. The completion notice slips.

How it works, step by step.

One project, De Lindehof with 24 apartments, from a photo during the build to the handover file. Click through the steps.

  1. 1 · Thu 15:10A photo before the wall closes.The site manager sends it, the way he already does. The photo lands with the right building part, with date and place.
    Haverkamp Bouw
    [Photo] Lindehof block B, 2nd floor. Cavity insulation is in, closes tomorrow.15:10
    Thanks Henk. Saved under block B, facade, with date and place. Also a photo of the connection at the window frame?15:11
    [Photo] Frame B2.0415:16
    Added. Block B facade is complete.15:16
  2. 2 · Fri 08:00Per building part, you see what’s there.Photos, inspections and drawings with the part they belong to. What is still missing is noted.
    Google Drive

    Evidence De Lindehof, week 44

    Building partEvidenceSourceDate
    Block B, facadePhotos insulation and frames (6)Henk, WhatsApp29 OctComplete
    Block A, fire safetyPhotos penetrations (14)Brandwerend Oost22 OctComplete
    Block A, electricalInspection reportElektro BrandsMissing
    As-built drawings MVersion 3 or 4?Klimaatgroep Noord15 OctFollow up

    The quality assurer gets the evidence every week, in a folder of their own.

  3. 3 · Fri 08:05What’s missing is requested.From the subcontractor who has to supply it, with exactly what is needed. The answer goes straight into the file.
    GmailFri 14:22

    Re: Electrical inspection report block A, De Lindehof

    Elektro Brands, Projects → lindehof@haverkampbouw.nl

    Good afternoon,

    Attached is the inspection report for block A, plus the circuit statements per apartment.

    Block B follows after the inspection on 12 November.

    Inspection report block A.pdfCircuit statements A (12).pdf
  4. 4 · Mon 08:30Your project manager sees where the file stands.Every Monday in Slack or Teams. What is still missing for handover, and who has to supply it.
    #lindehof
    E
    Everday

    Handover file De Lindehof: 3 weeks to handover, 2 items open.

    • Blocks A and BEvidence complete
    • Electrical inspection block BPlanned 12 Nov
    • As-built drawings MCheck version
    Open fileCall Klimaatgroep Noord
  5. 5 · Fri 27 NovThe handover file is ready.The file for the building authority and the consumer file per home, with the source on every item. Your project manager checks it and files the completion notice.
    Handover file De Lindehof24 homes · 412 items · each with source and dateComplete

    File for the building authority

    • Quality assurer’s statement, received 25 Nov
    • Evidence per building part, blocks A and B
    • As-built drawings M and E, latest version

    Consumer file per home

    • Drawings and installation diagrams
    • Maintenance instructions and warranties
    • Circuit statement and inspections

    Still to do

    • Check and completion notice by your project manager

What’s in it.

Connections

  • Google Drive or SharePoint
  • WhatsApp Business
  • Gmail or Outlook
  • Your project administration

Tasks

  • Collecting evidence
  • Sorting per building part
  • Requesting missing items
  • Assembling the file

Channels

  • WhatsApp
  • Email
  • PDF

Pages

  • File per project
  • Folder for your quality assurer

You stay in control.

  • Every item has a source, a date and a place in the project.
  • What goes into the file, your project manager checks.
  • The completion notice and the handover, you do yourself.

More work in Construction.

PDFGoogle DriveGmailYour estimating

Tender and estimating.

The tender documents read, every requirement and risk on one page with where it says so, and subcontractor quotes side by side. Your estimator chooses.

See how it works
WhatsAppGmailYour planningGoogle Calendar

Work preparation and planning.

Requests by email, WhatsApp and phone turned into work orders, and tomorrow’s planning prepared. Your planner approves.

See how it works
WhatsAppYour time trackingPDFGmail

Hours and extra work.

Yesterday’s work orders checked, hours booked, and extra work flagged and put to your client before it’s forgotten.

See how it works

Start with a conversation.

Half an hour on the work that comes round every week, and what AI can do there first.